Ditulis Oleh Minarak LJ System Admin
|
|
Jumat, 05 September 2008 |
|
PENGUMUMAN "DAFTAR NAMA PEMILIK TANAH dan BANGUNAN"
DATA REALISASI PENYELESAIAN 20% PER 05 SEPTEMBER 2008
| KETERANGAN |
JUMLAH BERKAS |
NILAI 20% |
| REALISASI PIJB 20% TAHAP I |
12.061 |
RP 656.518.405.100 |
| REALISASI PIJB 20% TAHAP II |
39 |
RP 6.132.025.000 |
| TOTAL PIJB 20% |
12.100 |
RP 662.650.430.100 |
DATA REALISASI PENYELESAIAN 80% PER 05 SEPTEMBER 2008
| MODEL PENYELESAIAN (80%) |
JUMLAH BERKAS |
NILAI TRANSAKSI (RP) |
JUMLAH KAVLING |
LUAS LAHAN (M2) |
JUMLAH BANGUNAN |
NILAI SUSUK (RP) |
NILAI NOMBOK (RP) |
| CASH & CARRY |
828 |
206.135.084.000,- |
- |
- |
- |
- |
- |
| RESETTLEMENT (AJB) |
1.104 |
164.385.568.000,- |
1.110 |
128.828 |
1.096 |
55.999.479.000,- |
1.357.125.000,- |
| RESETTLEMENT (NON AJB) |
447 |
158.170.917.440,- |
838 |
115.700 |
418 |
52.576.193.000,- |
343.782.000,- |
| CASH & RESETTLEMENT (GKLL) |
1003 |
369.384.135.200,- |
2.128 |
249.223 |
- |
193.854.885.000,- |
45.980.000,- |
|
|
|
Kolam Penampungan Overload |
|
Ditulis Oleh ttk
|
|
Jumat, 05 September 2008 |
|
Sidoarjo - Lantaran kolam penampungan lumpur (pond) Overload, banyak yang mulai tak kuasa menampung aliran lumpur dari pusat semburan sejak Kamis (4/9/20080) malam, pembuangan lumpur kini difokuskan ke Kali Porong lagi.
|
|
Baca Lebih Lengkap...
|
|
|
Kembali, LBI Cairkan Uang Kontrak |
|
Ditulis Oleh dad
|
|
Jumat, 05 September 2008 |
|
Sidoarjo- Lapindo Brantas, Inc kembali mencairkan uang kontrak bagi warga terdampak lumpur yang masih tinggal di Pengungsian Pasar Baru Porong di Gedung Ex BTPN Sidoarjo |
|
Baca Lebih Lengkap...
|
|
|
|